Injection Hose Installation

For sealing construction joints without hydrophilic or metal waterstops, injection hose systems are very popular. Installed prior to the concrete pour, the hose is then injected to completely seal the interfaces.

It’s a perfect solution when you’re using sheet piles as a liner wall in the basement, or where using a kicker isn’t appropriate. It’s also great for connecting concrete to concrete, whether new or old.

Our highly skilled teams have had continued success with this system. Injection hose installation is:

  • Easy to install and flexible compared to traditional joint systems
  • Usable in challenging, complex situations and adverse weather conditions
  • Robust, ensuring a watertight joint for the life of the structure
  • Able to be installed directly onto the construction joint
  • An ideal technical method for both preventative and remedial solutions

Work with MPS and enjoy a full service, from planning to supply and installation. We’ve got so much confidence in the system that we’re proud to offer a 10-year warranty.

That makes a watertight solution simple. Do you want to know more?

Benefits of Injection Hose Installation

  • Easy installation and flexible alternative to traditional joint system
  • Can be used in challenging and complex situations, including adverse weather conditions
  • An injectable solution to ensure a watertight joint for the life of the structure
  • Installation directly onto the construction joint
  • An alternative solution to joint profiles or metal waterstops
  • No kicker required, therefore reducing site labour and construction programme
  • Technical method for preventive
MPS offers a full injection hose service: We advise, supply and install. All of our injection hose systems are issued with a 10 year warranty.

MPS – Making watertight solutions simple.

Tel:
+44 (0) 1954 780687

Email:
sales@dbgholdings.com

Martyn Smith

Director

Martyn started off his career in concrete working as a Contracts Manager for a waterproofing manufacturer.

He started MPS Concrete Solutions in 2013 when he saw a gap in the market for quality concrete repair and injection hose installation.

In his spare time, he is an avid West Ham fan and a county pool player.

Frank McGinley

Business Development Manager

Frank brings 10 years' knowledge of waterproofing injection resins and over 25 years’ experience in the waterproofing and concrete repair sectors overall. Having worked extensively with bandage systems and injection hose products, he has a broad knowledge of materials and methods for the remedial repair of movement and construction joints, as well as leaking concrete and soil stabilisation techniques.

Frank supports Spurs and enjoys a test match during the summer.

Our Brands

Tel: +44 (0)1954 780687 | Email: sales@dbgholdings.com

DB Group, Wellington Way, Bourn Airfield, Cambridge. CB23 2TQ

Tel: +44 (0)1954 780687

DB Group, Wellington Way, Bourn Airfield, Cambridge. CB23 2TQ