MPS Concrete Case Studies
The Ridgeway, Mill Hill
This high-profile London development called for meticulous attention to detail in an open, well trafficked construction area and the clock was ticking. MPS Concrete Solutions were the team for the job.
Center Parcs, Nottingham
The wave pool needed essential maintenance to its two balance tanks during the lockdown period. MPS were tasked with identifying areas needing attention during their overall inspection.
Project George, London
The launch of this international software firm’s flagship UK store in London was shrouded in mystery. Behind the scenes, another installer had removed themselves from this project leaving the fit-out contractors with a big problem very close to the installation date. MPS stepped in to save the day.
Broadlands Business Campus, Horsham, West Sussex
This two-storey office park in West Sussex features a courtyard serving as an outdoor recreation area. MPS were tasked with creating a waterproof deck allowing for rainwater run-off, landscaping, as well as safeguarding the offices located directly beneath the deck area.
Sterling Court
Bromley South Central
When this project’s contractor was unable to seal a construction joint between old concrete and new, they called MPS to find the solution.
DB Group, Wellington Way, Bourn, CB23 2TQ
Tel: 01954 780687
Mob: 07527 245718 / 07701 320110
salesmps@mpsconcretesolutions.co.uk
Discover More About the DB Group

Tel: +44 (0)1954 780687 | Email: sales@dbgholdings.com
DB Group, Wellington Way, Bourn Airfield, Cambridge. CB23 2TQ

Tel: +44 (0)1954 780687
Email: sales@davidballgroup.com
DB Group, Wellington Way, Bourn Airfield, Cambridge. CB23 2TQ
